Probably 150 by the time they get the review panel set up.
It should be finished under 100 days after the election if they win.
I doubt they really need that much time anyhow.
I think he has allowed a few weeks off over the Christmas/New Year period in those 100 days.
I would be surprised if he did not have his panel names in place now on the good chance they win the election.
The panel would have to do the majority of their work pre-Christmas.
The first thing they should request is all the files from the Quirk review.
 
Last edited:
It should be finished under 100 days after the election if they win.
I doubt they really need that much time anyhow.
I think he has allowed a few weeks off over the Christmas/New Year period in those 100 days.
I would be surprised if he did not have his panel names in place now on the good chance they win the election.
The panel would have to do the majority of their work pre-Christmas.
The first thing they should request is all the files from the Kirk review.
1729641389832.png

1729641430612.png

The Kirk review, or the Quirk review?
 

Log in to remove this ad.

I would be surprised if he did not have his panel names in place now on the good chance they win the election.
The panel would have to do the majority of their work pre-Christmas.
The first thing they should request is all the files from the Quirk review.
I admire your optimism. Remember these guys are politicians. They will find ways to invent red tape and draw out the process to 2026 and beyond. If it goes ahead at all.
 